Tentative Advertising Schedule

As of 04/14/2021 03:08 AM AKDT

This report includes projects that we anticipate advertising in the next 12 months. Unless otherwise stated, plans and specifications are not available at this time. Please check out the Bid Calendar for projects currently advertising.

Click here to generate an Excel file of the report below.

FAST Intersection improvements FFY2021
Federal# / IRIS Program#: Pending / NFHWY00524
Region: Northern Region
Location: Fairbanks North Star Borough
Manager: John J Netardus     Phone: (907)451-5448
Anticipate Advertising In: April 2021
Description of Work: Improve intersections in the City of Fairbanks and Fairbanks North Star Borough: South Cushman Street and 23rd Avenue, Chena Pump Road and Chena Point Avenue, and Sheep Creek Road Extension and Tanana Loop Road. Work includes drainage improvements, roadside hardware, and utilities.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:
Preliminary Plans PDF document

GLENN PARKS INTERCHANGE REPAIRS - NOV 2018 EQ PR
Federal# / IRIS Program#: 0091011 / CFHWY00594
Region: Central Region
Location: Central Region
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: April 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing permanent repairs to damage caused by embankment and slope failures from the November 30, 2018 earthquake. This repair project includes embankment and structural section reconstruction, grading, paving, guardrail, and striping. The project area includes sites at the Glenn Hwy-Old Glenn Hwy interchange near MP 29.5, the Glenn Hwy-Parks Hwy interchange flyover near MP 34.5, and Glenn Hwy MP 36.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

JNU-RESURFACE GLCR HWY: VANDERBILT HILL RD EGAN TO GLCR HWY
Federal# / IRIS Program#: 0003243 / SFHWY00241
Region: Southcoast Region
Location: Juneau
Manager: David A Pyeatt     Phone: (907)465-4490
Anticipate Advertising In: April 2021
Description of Work: Juneau Resurface Glacier Highway: Vanderbilt Hill Road Egan to Glacier Hwy. Project will include pavement rehabilitation by cold planning and pavement overlay, pavement pre-leveling, repair of minor structural sections, culvert lining, guardrail replacement, sign replacement, pavement striping (inlaid MMA and traffic paint), tree clearing, and removal of abandoned utility poles.
Engineer's Estimate Range:
Additional Info:

Kalskag Airport (KLG) Surface Preservation Maintenance (SPM)
Federal# / IRIS Program#: CFAPT00823 / AIP 3-02-0200-XXX-2021 / 21-25-1-031
Region: Central Region
Location: Kalskag
Manager: Michael D Cook     Phone: (907)269-0767
Anticipate Advertising In: April 2021
Description of Work: Scarify, reshape and recompact surfacing material at runway, taxiway, and apron to proper profile. Apply dust palliative to retain the critical fine particles now present in the crushed surface and to bind aggregate to prevent loss of fines from the runway, taxiway, and apron surfaces. Apply dust palliative for RWY 6/24 (3,200 LF), TWY (208 LF) and apron (11,250 SY). Work shall consist of spot treatments for all areas within the limits designated on the drawings or as required by the Project Manager. All work shall be in accordance with the Alaska Department of Transportation & Public Facilities “Standard Specifications for Airport Construction, revised 01/01/20” and attachments. Payment shall be made at the contract unit price. This payment shall be full compensation for all requirements of this contract.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:

Kaltag Airport Improvements
Federal# / IRIS Program#: 3-02-0137-___-____ / NFAPT00254
Region: Northern Region
Location: Kaltag
Manager: Christopher F Johnston     Phone: (907)451-2322
Anticipate Advertising In: April 2021
Description of Work: Resurface the runway, taxiway, apron, and access road and apply dust palliative to operational surfaces. Remove airspace obstructions and rehabilitate. Replace the SREB, segmented circle, and airport lighting and electrical components.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info:
Preliminary Plans PDF document

Koliganek Airport (JZZ) Surface Preservation Maintenance (SPM)
Federal# / IRIS Program#: CFAPT00820 / AIP 3-02-0200-XXX-2021 / 21-25-1-029
Region: Central Region
Location: Koliganek
Manager: Michael D Cook     Phone: (907)269-0767
Anticipate Advertising In: April 2021
Description of Work: Purchase, haul, place and compact crushed aggregate surface course (CASC) for RWY 9/27 (3,300 LF), TWY (175 LF) and Apron (66,667 SY (as needed)). All work shall be in accordance with the Alaska Department of Transportation & Public Facilities “Standard Specifications for Airport Construction, revised 01/01/20” and attachments. Payment shall be made at the contract unit price. This payment shall be full compensation for all requirements of this contract.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:

Kotzebue Third Avenue Sidewalks (TAP)
Federal# / IRIS Program#: TA18005 / NFHWY00359
Region: Northern Region
Location: Kotzebue
Manager: Jonathan J Hutchinson     Phone: (907)451-5479
Anticipate Advertising In: April 2021
Description of Work: Construct pedestrian facilities along Third Avenue from the Airport Access Road to Garden Street including roadside hardware, drainage improvements, ADA improvements, and utilities.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info: CY21
Preliminary Plans PDF document

Mt. Edgecumbe High School Freezer & Cooler Building Replacement
Federal# / IRIS Program#: N/A / 2501000087
Region: Central Region
Location: Sitka
Manager: Christopher S Hodgin     Phone: (907)269-7484
Anticipate Advertising In: April 2021
Description of Work: Demolition of existing freezer and cooler building and replacement with new building.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info: Advertising Date dependent on receipt of funds from user agency.

Northern Region LED Lighting Replacement
Federal# / IRIS Program#: 0002407 / NFHWY00277
Region: Northern Region
Location: Regionwide
Manager: Carl F Heim     Phone: (907)451-5359
Anticipate Advertising In: April 2021
Description of Work: Upgrade the existing highway lighting system to a wireless control system and install more energy efficient technologies. Work will include illumination and roadside hardware.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:
Preliminary Plans PDF document

PW 76: WILLOW FISHHOOK MP 34
Federal# / IRIS Program#: DR-4094-PW-76 / RSA0954004
Region: Central Region
Location: Wasilla
Manager: Jesse Campbell     Phone: (907)269-0820
Anticipate Advertising In: April 2021
Description of Work: This federally funded project will repair a failed embankment at MP 34 of Willow Fishhook Road. Work to include clearing and grubbing, excavation, and placement of aggregate base course and class III rip rap.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info: Repair of failed embankment at MP 34 of Willow Fishhook Road. Work to include clearing and grubbing, excavation, and placement of aggregate base course and class III rip rap.

Red Devil Airport (RDV) Surface Preservation Maintenance (SPM)
Federal# / IRIS Program#: CFAPT00824 / AIP 3-02-0200-XXX-2021 / 21-25-1-032
Region: Central Region
Location: Red Devil
Manager: Michael D Cook     Phone: (907)269-0767
Anticipate Advertising In: April 2021
Description of Work: Scarify, reshape and recompact surfacing material at runway, taxiway, and apron to proper profile. Apply dust palliative to retain the critical fine particles now present in the crushed surface and to bind aggregate to prevent loss of fines from the runway, taxiway, and apron surfaces. Apply dust palliative for RWY 10/28 (4,800 LF), TWYs A (325 LF), B (220 LF) and Apron (13,333 SY). Work shall consist of spot treatments for all areas within the limits designated on the drawings or as required by the Project Manager. All work shall be in accordance with the Alaska Department of Transportation & Public Facilities “Standard Specifications for Airport Construction, revised 01/01/20” and attachments. Payment shall be made at the contract unit price. This payment shall be full compensation for all requirements of this contract.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:

Seldovia Airport (SOV) Obstruction Removal
Federal# / IRIS Program#: CFAPT00821 / AIP 3-02-0200-XXX-2021 / 21-25-1-030
Region: Central Region
Location: Seldovia
Manager: Michael D Cook     Phone: (907)269-0767
Anticipate Advertising In: April 2021
Description of Work: Remove trees in the Rwy 34 approach to include off airport property in the avigation & hazard easements. Estimated acreage is 4.9 on property and 5.4 in aviation & hazard easements. All work shall be in accordance with the Alaska Department of Transportation & Public Facilities “Standard Specifications for Airport Construction, revised 01/01/20” and attachments. Payment shall be made at the contract unit price. This payment shall be full compensation for all requirements of this contract.
Engineer's Estimate Range: Less than $200,000
Additional Info:

TOGIAK AIRPORT RESURFACING AND LIGHTING REPLACEMENT
Federal# / IRIS Program#: N/A / CFAPT00276
Region: Central Region
Location: Togiak
Manager: Aaron C Hughes     Phone: (907)269-0523
Anticipate Advertising In: April 2021
Description of Work: Resurface the runway, taxiway, and apron. Install/replace runway and taxiway lighting.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info: The project proposes to resurface the runway, taxiway, apron, and access road at the Togiak Airport. Improvements may also include lighting, markings, signs, navigational aids, drainage, a dust palliative, vegetation clearing, and utilities. This project is expected to be ready to advertise but federal funding is not currently expected to be available this federal fiscal year.

AMATS: O'MALLEY RD RECONST: NEW SEWARD TO HILLSIDE (PARENT)
Federal# / IRIS Program#: 0512005 / Z539350000
Region: Central Region
Location: Anchorage
Manager: Christopher L Bentz     Phone: (907)269-0652
Anticipate Advertising In: May 2021
Description of Work: Termini & Project Name Revision: This is the second phase (PhII) of a two phase project to reconstruct O'Malley Rd. Updated Scope: Reconstruct O'Malley Road from Livingston St to Hillside Dr to improve safety and capacity @ intersections and provide the safety, capacity & pedestrian needs. Landscaping is not currently part of this project.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info: Preliminary Plans (~58 Mb)

ANC FAA TAXILANE REHABILITATION
Federal# / IRIS Program#: 3-02-0016-XXX-2019 / CFAPT00450
Region: Central Region
Location: Anchorage
Manager: Jennifer M Carle     Phone: (907)266-2731
Anticipate Advertising In: May 2021
Description of Work: Remove, replace and restripe approximately 5,500 square yards of taxilane pavement.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info: This project will bid with ANC Taxiway Kilo

ANC Taxiway K, G1, and J Improvements
Federal# / IRIS Program#: AIP 3-02-0016-XXX-2021 / CFAPT00498
Region: Central Region
Location: Anchorage
Manager: Matthew H Hansen     Phone: (907)269-0602
Anticipate Advertising In: May 2021
Description of Work: The project will resurface/rehabilitate the pavement surface, replace lighting, and provide improvements on Taxiways K, G1, and J at the Anchorage International Airport.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info: Rehabilitate Taxiways K, G1, and J. Improvements include paving, lighting, markings, signs, ditching, and storm drains.

Bethel DPS Hangar and Post Repairs
Federal# / IRIS Program#: N/A / 2501000093
Region: Central Region
Location: Central Region
Manager: Vadim Belozertsev     Phone: (907)269-0879
Anticipate Advertising In: May 2021
Description of Work: Repair concrete slab, insulation, hangar door flashing, improve heating and ventilation, replace window panes, ADA access repairs.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info:

BETHEL MAIN RUNWAY RECONSTRUCTION
Federal# / IRIS Program#: N/A / CFAPT00430
Region: Central Region
Location: Bethel
Manager: Aaron C Hughes     Phone: (907)269-0523
Anticipate Advertising In: May 2021
Description of Work: Reconstruct Bethel RW 1L/19R and TWs C & A to accomodate 737-800 as Design Aircraft. Replace lighting and pave runway shoulders.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info: Reconstruct Bethel Airport's main runway 1L/19R, TW C and other connecting taxiways. Project includes replacing airport lighting, electrical equipment buildings, signing, markings, and visual navaids. Project is expected to be bid in FFY 2021 with construction in summer 2022 and 2023. Preliminary Plans (~25 Mb)

BUFFALO MINE ROAD 00118 - NOV 2018 EQ PR
Federal# / IRIS Program#: N/A / CDRER00582
Region: Central Region
Location: Palmer
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: May 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing to repair damage from the November 30, 2018, earthquake. Work under this contract will consist of permanent repairs which will include embankment reconstruction, roadway reconstruction, establishing drainage, grading, paving, and striping. There are two locations along Buffalo Mine Road. The first being an approximate 800 foot, one lane roadway reconstruction and 1200 foot guardrail replacement near MP 0.5. The second location is an approximate 200 foot, one lane embankment reconstruction near MP 3.0.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info: This is one of 6 projects that will be advertised together as one contract – CDRER00577, CDRER00580, CDRER00581, CDRER00582, CDRER00605, and CDRER00606.

CLARK-WOLVERINE ROAD 00031- NOV 2018 EQ PR
Federal# / IRIS Program#: N/A / CDRER00581
Region: Central Region
Location: Palmer
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: May 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing to repair damage from the November 30, 2018 earthquake. This repair project is to include embankment reconstruction, roadway reconstruction, retaining wall establishment, establishing drainage, grading, paving, striping, and guardrail. There are two locations along Clark-Wolverine Road between MP 5.5 and 6.5.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info: This is one of 6 projects that will be advertised together as one contract – CDRER00577, CDRER00580, CDRER00581, CDRER00582, CDRER00605, and CDRER00606.

CLARK-WOLVERINE ROAD AND HUNTLEY ROAD 00046 - NOV 2018 EQ PR
Federal# / IRIS Program#: N/A / CDRER00606
Region: Central Region
Location: Palmer
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: May 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing to repair damage from the November 30, 2018, earthquake. Work under this contract will consist of permanent repairs to Clark-Wolverine Road and Huntley Road which will include embankment reconstruction, roadway reconstruction, cracksealing, grading, paving, and striping.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info: This is one of 6 projects that will be advertised together as one contract – CDRER00577, CDRER00580, CDRER00581, CDRER00582, CDRER00605, and CDRER00606.

Copper River Highway MP 21.5 Culvert Replacement
Federal# / IRIS Program#: 0851071 / NFHWY00494
Region: Northern Region
Location: Cordova
Manager: David K Fischer     Phone: (907)451-5357
Anticipate Advertising In: May 2021
Description of Work: Replace a fish pass culvert at MP 21.5 on the Copper River Highway.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:
Preliminary Plans PDF document

Dalton Highway MP 289-305 Rehabilitation
Federal# / IRIS Program#: 0656005 / Z609130000
Region: Northern Region
Location: Atigun River
Manager: David K Fischer     Phone: (907)451-5357
Anticipate Advertising In: May 2021
Description of Work: Rehabilitate and widen the Dalton Highway between Mileposts 289 and 305. Project work will include minor realignments, grade raises, turnouts, roadside hardware and drainage improvements.
Engineer's Estimate Range: Between $30,000,000 and $40,000,000
Additional Info:
Preliminary Plans PDF document

Ekwok Airport and New Stuyahok Airport Resurfacing
Federal# / IRIS Program#: N/A / CFAPT00292
Region: Central Region
Location: Ekwok
Manager: Matthew H Hansen     Phone: (907)269-0602
Anticipate Advertising In: May 2021
Description of Work: The project proposes to resurface the runways, taxiways, and aprons at the Ekwok Airport and New Stuyahok Airport. Improvements may also include lighting, markings, drainage, a dust palliative, visual aids, and removal of obstructions. The embankment at New Stuyahok will be extended to comply with updated FAA standards.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info: Project will resurface the gravel runways, taxiways, and aprons at the Ekwok and New Stuyahok Airport.

FFY18 VARIOUS PRIMARY/NON-PRIMARY EAS A/P VISUAL AID REPLCMN
Federal# / IRIS Program#: 3-02-0200-121-2018 / SFAPT00174
Region: Southcoast Region
Location: Regionwide
Manager: Charles M Tripp     Phone: (907)465-4439
Anticipate Advertising In: May 2021
Description of Work: Replace beacon at Yakutat. Phase 2: CC: 24300169 LC: 33003062
Engineer's Estimate Range:
Additional Info: Anticipate advertising with another project to relocate the Segmented Circle and Lighted Wind Cone.

FFY19 VARIOUS PRIMARY/NON PRIMARY EAS AIRPORTS VISUAL AID RE
Federal# / IRIS Program#: 3-02-0200-126-2019 / SFAPT00203
Region: Southcoast Region
Location: Regionwide
Manager: Marcus G Zimmerman     Phone: (907)465-4655
Anticipate Advertising In: May 2021
Description of Work: Remove and relocate Primary wind cone and Segmented Circle, add gravel pad and access road to new location in Yakutat. Phase 2 - CC 24300192 LC 33003512
Engineer's Estimate Range:
Additional Info:

Growden Area Accessibility Improvements (ATAP)
Federal# / IRIS Program#: 0002453 / NFHWY00454
Region: Northern Region
Location: Fairbanks North Star Borough
Manager: John J Netardus     Phone: (907)451-5448
Anticipate Advertising In: May 2021
Description of Work: Construct a new asphalt pathway through Growden Park from Stewart Street to Wilbur Street to Second Avenue including roadside hardware, ADA compliant curb ramps, and crosswalks.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:
Preliminary Plans PDF document

KNIK RIVER ROAD, PALMER 00030 - NOV 2018 EQ PR
Federal# / IRIS Program#: N/A / CDRER00580
Region: Central Region
Location: Palmer
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: May 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing to repair damage from the November 30, 2018, earthquake. Work under this contract will consist of permanent repairs which will include roadway reconstruction, establishing drainage, grading, paving, and striping. The location along Knik River Road is approximately 300 feet of two lane roadway reconstruction and ditch rebuilding.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info: This is one of 6 projects that will be advertised together as one contract – CDRER00577, CDRER00580, CDRER00581, CDRER00582, CDRER00605, and CDRER00606.

KTN Herring Cove Bridge Improvement
Federal# / IRIS Program#: 0902043 / SFHWY00072
Region: Southcoast Region
Location: Ketchikan
Manager: Bran P Pollard     Phone: (907)465-4526
Anticipate Advertising In: May 2021
Description of Work: This project would replace the existing Herring Cove Bridge to include pedestrian facilities. Other improvements include the following; improve the intersections at Powerhouse Road and Wood Road, resurface the roadway, install proposed culverts, install new asphalt sidewalks, install new guardrail, install new traffic signs and striping.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

LAKE LOUISE ROAD RESURFACING
Federal# / IRIS Program#: 0809007 / NFHWY00481
Region: Northern Region
Location: Lake Louise
Manager: Guangyan T Griffin     Phone: (907)451-5087
Anticipate Advertising In: May 2021
Description of Work: Resurface Lake Louise Road between milepost 9-19 with doubleshot chip seal. Project will include minor leveling, grading, clearing, drainage improvements, roadside hardware, and striping.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:
Preliminary Plans PDF document

MCGRATH SNOW REMOVAL EQUIPMENT BUILDING
Federal# / IRIS Program#: 3-02-0176-007-2021 / CFAPT00626
Region: Central Region
Location: Mcgrath
Manager: Eric F Hershey     Phone: (907)269-5572
Anticipate Advertising In: May 2021
Description of Work: This federally funded project will construct a new four-bay Snow Removal Equipment Building (SREB) at the site of the existing four-bay SREB that was determined to be a total loss following a roof collapse in early 2020.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

NAPASKIAK AIRPORT SNOW REMOVAL EQUIPMENT BUILDINGS
Federal# / IRIS Program#: AIP 3-02-0189-00X-20XX / CFAPT00278
Region: Central Region
Location: Napaskiak
Manager: Matthew R Epp     Phone: (907)754-3561
Anticipate Advertising In: May 2021
Description of Work: This federally funded project shall include all labor, materials, equipment, and supervision required to demolish, remove and dispose of existing facilities and to construct two new snow removal equipment buildings for the Alaska Department of Transportation and Public Facilities (the Department) as described in the Contract Documents.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info: FFY 2021 Expected project

OLD RABBIT CREEK ROAD 00029 - NOV 2018 EQ PR
Federal# / IRIS Program#: N/A / CDRER00605
Region: Central Region
Location: Anchorage
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: May 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing to repair damage from the November 30, 2018, earthquake. There are two locations along Old Rabbit Creek Road. The first being an approximate 1600 foot, two lane roadway reconstruction. The second is an approximate 800 foot, two lane roadway reconstruction. Work is to include roadway reconstruction, grading, paving, and striping.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info: This is one of 6 projects that will be advertised together as one contract – CDRER00577, CDRER00580, CDRER00581, CDRER00582, CDRER00605, and CDRER00606.

Rosie Creek Road Improvements
Federal# / IRIS Program#: 0002353 / NFHWY00017
Region: Northern Region
Location: Fairbanks North Star Borough
Manager: David K Fischer     Phone: (907)451-5357
Anticipate Advertising In: May 2021
Description of Work: Improve Rosie Creek Road from Chena Ridge Road to Becker Ridge Road, to include alignment, shoulder work, repair and overlay of pavement, and intersection improvements at Chena Ridge Road.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:
Preliminary Plans PDF document

Shageluk Airport Access Road Improvements
Federal# / IRIS Program#: 0002163 / Z621710000
Region: Northern Region
Location: Shageluk
Manager: Christopher F Johnston     Phone: (907)451-2322
Anticipate Advertising In: May 2021
Description of Work: Reconstruct approximately 2.7 miles of the Shageluk Airport Access Road. Project includes roadside hardware, drainage improvements, and utilities.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:
Preliminary Plans PDF document

SLEETMUTE AIRPORT RESURFACING
Federal# / IRIS Program#: 3-02-0272-00X-20XX / CFAPT00293
Region: Central Region
Location: Sleetmute
Manager: Aaron C Hughes     Phone: (907)269-0523
Anticipate Advertising In: May 2021
Description of Work: The project proposes to resurface the runway, taxiway, apron, and access roads at the Sleetmute Airport. Improvements may also include snow removal equipment buildings, lighting, markings, signs, navigational aids, drainage, and a dust palliative.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info: The project proposes to resurface the runway, taxiway, apron, and access road at the Sleetmute Airport. Improvements may also include snow removal equipment buildings, lighting, markings, signs, navigational aids, drainage, a dust palliative, vegetation clearing, and utilities. This project is expected to be ready to advertise but federal funding is not currently expected to be available this federal fiscal year.

SR DM AIRPOR GATE/FENCE REPAIRS/REPLACEMENT
Federal# / IRIS Program#: N/A / SSAPT00093
Region: Southcoast Region
Location: Gustavus
Manager: Bran P Pollard     Phone: (907)465-4526
Anticipate Advertising In: May 2021
Description of Work: The Alaska Department of Transportation and Public Facilities is currently working on a project at the Gustavus Airport. Gustavus is located about 40 miles northeast from the City of Juneau.The project entails replacing an old 20’ electric cantilever gate with a new 24’ electric vertical pivot gate on a new concrete foundation. The new 24' vertical pivot gate will connect to the existing Airport Access Control System, existing automatic vehicle gate controllers, and existing auxiliary automatic vehicle gate safety control systems. Includes removal of existing 20' cantilever gate, removal of existing concrete foundation, and removal of any fencing required.
Engineer's Estimate Range:
Additional Info:

Tofty Road Sullivan Creek Drainage Improvements
Federal# / IRIS Program#: N/A / NSHWY00574
Region: Northern Region
Location: Tanana
Manager: Daniel S Adamczak     Phone: (907)451-2294
Anticipate Advertising In: May 2021
Description of Work: Construct a drainage crossing at Sullivan Creek on the Tofty Road.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info:

WILLOW-FISHHOOK ROAD 00027 - NOV 2018 EQ PR
Federal# / IRIS Program#: N/A / CDRER00577
Region: Central Region
Location: Matanuska Valley
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: May 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing to repair damage from the November 30, 2018 earthquake. This repair project is to include embankment reconstruction, roadway reconstruction, drainage replacement, slope stabilization, grading, paving, striping, and guardrail at two locations along Willow-Fishhook road.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info: This is one of 6 projects that will be advertised together as one contract – CDRER00577, CDRER00580, CDRER00581, CDRER00582, CDRER00605, and CDRER00606.

ANCHORAGE DISTRICT GROUP B - NOV 2018 EQ PR
Federal# / IRIS Program#: N/A / CFHWY00610
Region: Central Region
Location: Anchorage
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: June 2021
Description of Work: This project will construct repairs for the November 30, 2018 earthquake in the Central Region of Alaska. Repairs may include, but are not limited to, asphalt, embankment, roadside hardware, retaining walls, utilities, and drainage. This project repairs sites corresponding to Detailed Damage Inspection Reports DDIR AK 2019 02 115, DDIR AK 2019 119 , DDIR AK 2019 02 148, DDIR AK 2019 02 149, DDIR AK 2019 02 158, and DDIR AK 2019 02 161.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

Bettles Airport Lighting and Resurfacing
Federal# / IRIS Program#: Pending / Z613940000
Region: Northern Region
Location: Bettles
Manager: Christopher F Johnston     Phone: (907)451-2322
Anticipate Advertising In: June 2021
Description of Work: Resurface the runway, apron, and taxiway. Replace the airport lighting, apply dust palliative, and remove airspace obstructions.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

Bison Gulch Parking Area and Trail Enhancements (FLAP)
Federal# / IRIS Program#: 0002470 / NFHWY00522
Region: Northern Region
Location: Healy
Manager: Jennifer J Wright     Phone: (907)451-2275
Anticipate Advertising In: June 2021
Description of Work: Reconstruction of the parking area onto the west side of the Parks Highway near Milepost 245. Work includes drainage improvements and roadside hardware.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:
Preliminary Plans PDF document
Reports PDF document

Briggs Bridge - Nov 2018 EQ PR
Federal# / IRIS Program#: N/A / CFHWY00734
Region: Central Region
Location: Central Region
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: June 2021
Description of Work: This project proposes to repair damages to Briggs Bridge (No. 1739) in Eagle River, AK sustained during the Nov 2018 Cook Inlet earthquake.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info: This is one of 3 projects that will be advertised together as one contract – CFHWY00646, CHFWY00734, and CFHWY00786.

Cordova Airport ARFF and SREB Replacement
Federal# / IRIS Program#: Pending / Z768760000
Region: Northern Region
Location: Cordova
Manager: Lauren A Staft     Phone: (907)451-5424
Anticipate Advertising In: June 2021
Description of Work: Replace the ARFF and SREB buildings at the Merle K. "Mudhole" Smith Airport in Cordova.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info:

Cordova Center Pedestrian Connector (TAP)
Federal# / IRIS Program#: TA18007 / NFHWY00462
Region: Northern Region
Location: Cordova
Manager: Brian W Herning     Phone: (907)451-3018
Anticipate Advertising In: June 2021
Description of Work: Construct a covered staircase from the Cordova Center to the pool parking area. Work will include a concrete foundation, lighting and sign installation.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:

DOWLING ROAD AND 3RD AVE-NOV 2018 EQ PERMANENT REPAIRS (MOA)
Federal# / IRIS Program#: 0092011 / CFHWY00647
Region: Central Region
Location: Anchorage
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: June 2021
Description of Work: This project will construct repairs for the November 30, 2018 earthquake in the Central Region of Alaska. Repairs may include, but are not limited to, asphalt, embankment, roadside hardware, retaining walls, utilities, and drainage. This project repairs sites corresponding to Detailed Damage Inspection Reports DDIR AK 2019 02 0, DDIR AK 2019 02 0, DDIR AK 2019 02 0, DDIR AK 2019 02 0, and DDIR AK 2019 02 0.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

EAGLE RIVER LOOP PEDESTRAIN UNDERCROSSING - NOV 2018 EQ PR
Federal# / IRIS Program#: 0091018 / CFHWY00646
Region: Central Region
Location: Eagle River
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: June 2021
Description of Work: This project will construct repairs for the November 30, 2018 earthquake in the Central Region of Alaska. Repairs may include, but are not limited to, asphalt, embankment, roadside hardware, retaining walls, utilities, and drainage. This project repairs sites corresponding to Detailed Damage Inspection Reports DDIR AK 2019 02 32.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info: This is one of 3 projects that will be advertised together as one contract – CFHWY00646, CHFWY00734, and CFHWY00786.

Eagle River Loop Storm Drain - Nov 2018 EQ PR
Federal# / IRIS Program#: N/A / CFHWY00786
Region: Central Region
Location: Eagle River
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: June 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing to repair storm drain damage from the November 30, 2018, earthquake. Work under this contract will consist of permanent repairs to one storm drain on Eagle River Loop Road which will include embankment reconstruction, headwall replacement, and pipe and manhole replacement.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info: This is one of 3 projects that will be advertised together as one contract – CFHWY00646, CHFWY00734, and CFHWY00786.

East Hill Rd Pavement Preservation
Federal# / IRIS Program#: 0001600 / CFHWY00297
Region: Central Region
Location: Homer
Manager: Clint J Adler     Phone: (907)269-0544
Anticipate Advertising In: June 2021
Description of Work: This is a preventative maintenance project for resurfacing East Hill Rd from East End Rd to Skyline Dr. This may include signing, striping, drainage, pavement, dig-outs, curb ramps, guardrail, lighting, and utility relocation.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info: This is a preventative maintenance project for resurfacing East Hill Rd from East End Rd to Skyline Dr. This may include signing, striping, drainage, pavement, dig-outs, curb ramps, guardrail, lighting, and utility relocation.

GLENN HWY MP 40-68 - NOV 2018 EQ PR
Federal# / IRIS Program#: 0091012 / CFHWY00612
Region: Central Region
Location: Palmer
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: June 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing to repair damage from the November 30, 2018 earthquake. This federally funded contract will consist of permanent repairs to damage caused by embankment and slope failure that resulted from the earthquake. The project includes repairs at eight different sites on the Glenn Hwy from MP 42-59 and three sites on Knik Goose Bay Road from MP 14-16. Work includes embankment reconstruction, roadway reconstruction, grading, paving, guardrail, and striping.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

HSIP: ANCHORAGE PEDESTRIAN LIGHTING
Federal# / IRIS Program#: 0001607 / CFHWY00366
Region: Central Region
Location: Anchorage
Manager: Christopher L Post     Phone: (907)269-7885
Anticipate Advertising In: June 2021
Description of Work: This HSIP Funded Project will increase visibility, reduce pedestrian/bicycle crashes and other traffic incidences by installing lighting. The proposed improvements are consistent with the Alaska Strategic Highway Safety Plan, Special Users Strategies to identify and implement appropriate engineering to address high-crash locations involving bicyclists and pedestrians. This project is also inline with MOA Vision Zero Safety Goals.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info: Preliminary Plans (~38 Mb)

KIPNUK AIRPORT REHAB
Federal# / IRIS Program#: 3-02-0150-XXX-202X / CFAPT00505
Region: Central Region
Location: Kipnuk
Manager: Aaron C Hughes     Phone: (907)269-0523
Anticipate Advertising In: June 2021
Description of Work: Rehabilitate the runway, taxiway, apron, and airport access road surfaces and replace airport lighting at Kipnuk Airport, Alaska.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info: The contingent 2021 project will rehabilitate Kipnuk Airport's gravel runway, taxiway and apron. Airfield lighting and visual navaids will be replaced.

LHD RUNWAY 14/32 REHABILITATION
Federal# / IRIS Program#: 3-02-0013-XXX-2021 / CFAPT00704
Region: Central Region
Location: Anchorage
Manager: Jennifer M Carle     Phone: (907)266-2731
Anticipate Advertising In: June 2021
Description of Work: Rehabilitate 2,200 feet of Runway 14/32.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info: Project will rehabilitate the runway surface.

Mchugh RWIS Tower Upgrade
Federal# / IRIS Program#: 0106(094) / CFHWY00428
Region: Central Region
Location: Municipality Of Anchorage
Manager: John W Turley     Phone: (907)266-2171
Anticipate Advertising In: June 2021
Description of Work: RWIS facilities must be migrated off of the existing tower at McHugh MP 111.8 of the Seward Highway. The existing tower will be demolished and a new tower will be installed within DOT ROW.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:

NOME PORT ROAD RECONSTRUCTION
Federal# / IRIS Program#: 0002278 / Z621230000
Region: Northern Region
Location: Nome
Manager: Christopher F Johnston     Phone: (907)451-2322
Anticipate Advertising In: June 2021
Description of Work: Reconstruct and realign Port Road in Nome, including drainage improvements and construction of sidewalks.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

Noorvik Airport Rehabilitation
Federal# / IRIS Program#: Pending / NFAPT00255
Region: Northern Region
Location: Noorvik
Manager: Christopher F Johnston     Phone: (907)451-2322
Anticipate Advertising In: June 2021
Description of Work: Rehabilitate the runway, taxiway, apron, and airport lighting. Stabilize slopes, rehabilitate shoulders, and apply a dust palliative.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:
Preliminary Plans PDF document

AMATS: CHUGACH FOOTHILLS CONNECTOR, PHASE II
Federal# / IRIS Program#: TA18004 / CFHWY00387
Region: Central Region
Location: Anchorage
Manager: Kevin L Jackson     Phone: (907)269-0610
Anticipate Advertising In: July 2021
Description of Work: Project will construct a multi-use path on Tudor Road between Regal Mountain Drive and Campbell Airstrip Road. Work may include roadside hardware and drainage improvements.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

ANC TERMINAL LOOP ROAD IMPROVEMENTS
Federal# / IRIS Program#: N/A / CFAPT00642
Region: Central Region
Location: Anchorage
Manager: Matthew H Hansen     Phone: (907)269-0602
Anticipate Advertising In: July 2021
Description of Work: Rehabilitate the Terminal Loop Road beginning and ending at the South Aircraft Drive Intersection. Project includes pavement cold planning, paving, striping, drainage, signage, and lighting.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

AUKE BAY TERMINAL BUILDING AND ELECTRICAL IMPROVEMENTS
Federal# / IRIS Program#: 9500150 / SAMHS00279
Region: Marine Highways
Location: Juneau
Manager: Loren K Gehring     Phone: (907)465-8189
Anticipate Advertising In: July 2021
Description of Work: Make improvements to the Auke Bay Ferry Terminal Building, including: ticket counter modifications, bathroom modifications, door replacement, roof and gutter replacement, and drainage improvements. This project would also provide a new East Berth vessel shore tie electrical connection.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

CTF ALTERNATE ENTRANCE ALIGNMENT (WFL)
Federal# / IRIS Program#: AKBLM AFO 2014(1) / CFHWY00260
Region: Central Region
Location: Anchorage
Manager: Christopher L Post     Phone: (907)269-7885
Anticipate Advertising In: July 2021
Description of Work: Relocate the BLM Road to the Cambell Tract Facility 260 feet to align East 68th Avenue with intersection improvements to include bus stop and integration to existing signalized intersection.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

HSIP KTN STEDMAN & DEERMOUNT ST INTERSECTION SAFETY IMP
Federal# / IRIS Program#: 0003244 / SFHWY00186
Region: Southcoast Region
Location: Ketchikan
Manager: David B Epstein     Phone: (907)465-4483
Anticipate Advertising In: July 2021
Description of Work: Provide additional illumination at the Stedman/Deermount intersection to achieve a level of luminance that meets current DOT&PF standards. Construct a concrete sidewalk bulbout on the Stedman side of the marked crosswalk. The bulbout will extend from the existing sidewalk to the edge of the traveled way.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info:

HSIP: C ST: TUDOR AND DIMOND INTERSECTIONS
Federal# / IRIS Program#: 0001581 / CFHWY00236
Region: Central Region
Location: Anchorage
Manager: Jonathan W Knowles     Phone: (907)269-0643
Anticipate Advertising In: July 2021
Description of Work: Construct raised islands to channelize right turn movements. This will require widening the intersections, Right of Way acquisition, utility relocations and adjustments, storm drain relocation, replacement of some sidewalk, pathway, curb ramps, and curb and gutter, re-paving and re-striping the intersections, temporary traffic signals, and new permanent traffic signals.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

MAT-SU AREA REPAIRS - NOV 2018 EQ PERMANENT REPAIRS
Federal# / IRIS Program#: 0092008 / CFHWY00643
Region: Central Region
Location: Matanuska-Susitna Borough
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: July 2021
Description of Work: This project will construct repairs for the November 30, 2018 earthquake in the Central Region of Alaska. Repairs may include, but are not limited to, asphalt, embankment, roadside hardware, retaining walls, utilities, and drainage. This project repairs sites corresponding to Detailed Damage Inspection Reports DDIR AK 2019 02 042, DDIR AK 2019 02 044, DDIR AK 2019 02 066, DDIR AK 2019 096, DDIR AK 2019 02 098, DDIR AK 2019 02 167, DDIR AK 2019 02 191, and DDIR AK 2019 02 209.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

KENAI AREA REPAIRS - NOV 2018 EARTHQUAKE PERMANENT REPAIRS
Federal# / IRIS Program#: 0092007 / CFHWY00644
Region: Central Region
Location: Kenai Peninsula
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: August 2021
Description of Work: The Department of Transportation and Public Facilities (DOT&PF) is proposing permanent repairs to damage caused by embankment and slope failures from the November 30, 2018 earthquake. This repair project includes asphalt, embankment, roadside hardware, guard rails, and drainage (culvert replacement). The project areas includes the Sterling Highway from MP155.3 to MP155.7.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

MCCARTHY ROAD MP 41 CRYSTAL CREEK CULVERT REPLACEMENT (FLAP)
Federal# / IRIS Program#: 0850029 / NFHWY00538
Region: Northern Region
Location: Mccarthy
Manager: Daniel S Adamczak     Phone: (907)451-2294
Anticipate Advertising In: August 2021
Description of Work: Reconstruct the roadway at the Crystal Creek crossing and install new cross drainage. Work also includes drainage improvements and roadside hardware.
Engineer's Estimate Range:
Additional Info:

MET SEAPLANE FACILITY REFURBISHMENT
Federal# / IRIS Program#: N/A / SFAPT00270
Region: Southcoast Region
Location: Metlakatla
Manager: Loren K Gehring     Phone: (907)465-8189
Anticipate Advertising In: August 2021
Description of Work: Reconfigure seaplane float to eliminate excess area and rehabilitate remaining facility with new single float. Phase: T02000 - Par - All Costs
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info: Replace timber seaplane float at Metlakatla Seaplane facility. Project is contingent FY20. May not be ready for advertisement until FY21 pending FAA funding.

MINNESOTA DR: TUDOR TO 15TH AVE PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0421099 / CFHWY00132
Region: Central Region
Location: Anchorage
Manager: Clint J Adler     Phone: (907)269-0544
Anticipate Advertising In: August 2021
Description of Work: This is a Preventive Maintenance (PM) project for resurfacing Minnesota Drive in Anchorage, Alaska from Tudor Road to 15th Avenue. It will also include, as necessary: guardrail, drainage, signalization, ADA curb ramp improvements, signs and striping.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info: Resurface Minnesota Drive in Anchorage, Alaska from Tudor Road to 15th Avenue. It will also include, roadside hardware, drainage, signalization, ADA curb ramp improvements.

Parks Highway Bridge Replacements: Montana Creek, Sheep Creek, and Goose Creek
Federal# / IRIS Program#: 0A41034 / Z589760000
Region: Central Region
Location: Matanuska-Susitna Borough
Manager: Christina A Huber     Phone: (907)269-0572
Anticipate Advertising In: August 2021
Description of Work: The project proposes to replace two bridges and install a new bridge along the Parks Highway in the Matanuska-Susitna Borough within Southcentral Alaska. Montana Creek Bridge (#215) is located near milepost MP 96. Sheep Creek Bridge (#213) is located near MP 88. The Goose Creek crossing (bridge #4040) is located near MP 93. The proposed Goose Creek Bridge will replace three primary arch-pipes and two overflow pipes. Additional work includes: • roadway structural section rehabilitation; • temporary detour bridges; • roadway profile adjustments to match the new bridge elevations; • shared-use pathway network adjustments and PUC extensions (Sheep and Montana Creeks only); • pedestrian bridge: a) relocation (Montana Creek); and b) removal (Sheep Creek); • ditches and drainage culverts; • driveways; • guardrail, signage, and striping; • utility adjustments; • streambank stabilization and fish passage improvements; • vegetation clearing and grubbing; and • soil stabilization.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info: 58976_Preliminary Plans (~15 Mb)

SEWARD HWY: MP 17-22.5 REHABILITATION
Federal# / IRIS Program#: 0311032 / Z536100000
Region: Central Region
Location: Kenai Peninsula
Manager: Clint J Adler     Phone: (907)269-0544
Anticipate Advertising In: August 2021
Description of Work: Rehabilitate the Seward Highway from MP 17 to MP 22.5. Replace the bridge at Victor Creek (#0607), rehabilitate the bridges over Snow River (#0605 and #0603), and may include widening shoulders and the construction of passing lanes where feasible.
Engineer's Estimate Range: Between $60,000,000 and $70,000,000
Additional Info: Preliminary Plans Vol 1 (~37 MB) Preliminary Plans Vol 2 (~39 MB) Draft Geotechnical Report (~25 MB)

Seward Meridian Parkway Road Improvements, Phase II Palmer-Wasilla Highway to Seldon Road
Federal# / IRIS Program#: 0001417 / Z512210000
Region: Central Region
Location: Wasilla
Manager: Christopher L Bentz     Phone: (907)269-0652
Anticipate Advertising In: August 2021
Description of Work: Upgrade Seward Meridian to a four-lane roadway and a multi-use, separated pathway along the west side from the Palmer-Wasilla Highway to Bogard Road and extend SMP one mile from Bogard Road to Seldon Road. Intersection improvements include a new roundabout at the Bogard Road intersection and a new signal at Seldon Road. A new bridge would replace the existing culvert at the Cottonwood Creek crossing.
Engineer's Estimate Range: Between $30,000,000 and $40,000,000
Additional Info:

JNU EGAN YANDUKIN INTERSECTION IMPROVEMENTS HSIP
Federal# / IRIS Program#: 0003261 / SFHWY00307
Region: Southcoast Region
Location: Juneau
Manager: David B Epstein     Phone: (907)465-4483
Anticipate Advertising In: September 2021
Description of Work: Set seasonal speed limit reduction on Egan in the vicinity of the Egan Yandukin intersection. Improve delineation for both left turns on Egan to improve line of sight and reduce travel distance to clear opposing traffic. Improve delineation for the northbound right turn movement from Egan to make it easier for southbound left turn drivers to determine if opposing traffic is executing the right turn or continuing through the intersection.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

KTN FERRY TERMINAL IMPROVEMENTS (X-REF#SAMHS00015)
Federal# / IRIS Program#: 000S855 / Z674660000
Region: Marine Highways
Location: Ketchikan
Manager: Loren K Gehring     Phone: (907)465-8189
Anticipate Advertising In: September 2021
Description of Work: This project encompasses the replacement of an existing vessel berthing and turning dolphin structure at the west end of Berth 1; placement of a new turning dolphin between Berths 1 and 3, refurbishment of fendering and platform components at the Berth 3 float; construction of a new pedestrian cover structure over the existing sidewalk from the terminal building to the Berth 3 approach; and the placement of cathodic protection anodes on all existing offshore pile supported structures at Berths 1 and 3.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info: Refurbish fender system at Berth 3 and conduct minor improvements to utilities at Berth 1.

SIT HALIBUT POINT RD & PETERSON AVE INTERSECTION SAFETY IMPR
Federal# / IRIS Program#: 0003214 / SFHWY00103
Region: Southcoast Region
Location: Sitka
Manager: David B Epstein     Phone: (907)465-4483
Anticipate Advertising In: September 2021
Description of Work: Provide additional illumination at the Halibut Point Road/Peterson Avenue Intersection to achieve a level of luminance that meets current DOT&PF standards. Modify adjacent roadway lighting as needed to maintain satisfactory continuous illumination. Establish a pass-through crossing to facilitate less challenging pedestrian movements. Improve intersection sight distance by removing utility equipment located in the southeast quadrant of the intersection, acquiring property to remove parking spaces that, when occupied, create sight line obstructions, and modifying access to an apartment building adjacent to the intersection (shorten curb cut). Replace existing S1-1 School signs with W11-2 advance pedestrian warning signs.
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info:

SR REGIONWIDE NHS SLOPE STABILIZATION
Federal# / IRIS Program#: 0003188 / Z686560000
Region: Southcoast Region
Location: Regionwide
Manager: Darryl Lester     Phone: (907)465-4421
Anticipate Advertising In: September 2021
Description of Work: This project will repair and/or rehabilitate unstable slopes, and possibly provide monitoring and warning systems on Haines Highway a NHS roads within the Southcoast Region.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

A STREET, NORTHERN LIGHTS TO 40TH AVE PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0527030 / CFHWY00223
Region: Central Region
Location: Anchorage
Manager: Kevin L Jackson     Phone: (907)269-0610
Anticipate Advertising In: October 2021
Description of Work: Pavement preservation of A Street from Northern Lights Blvd to 40th Ave including improvements to drainage, intersections, ADA, roadside hardware, and utilities.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

AMATS: REEVE BLVD: 5TH AVE TO POST RD PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0535002 / CFHWY00281
Region: Central Region
Location: Anchorage
Manager: Galen K Jones     Phone: (907)269-0550
Anticipate Advertising In: October 2021
Description of Work: The scope of this project is to preserve Reeve Boulevard by milling and replacing existing pavement from 5th Avenue to Post Road. The project will include, as necessary, replacement of curb ramps, curb and gutter, signage, and striping.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

ANC GATES B4, B6, B7, B8, & B9 IMPROVEMENTS
Federal# / IRIS Program#: 3-02-0016-XXX-2021 / CFAPT00718
Region: Central Region
Location: Anchorage
Manager: Jenelle R Brinkman     Phone: (907)269-0606
Anticipate Advertising In: October 2021
Description of Work: This project will re-seal joints and repair cracks in concrete handstands at Gate B4, B6, B7, B8, & B9 and perform drainage repairs as required. Expected funding FFY 2022.
Engineer's Estimate Range:
Additional Info:

HSIP: A ST. MIDTOWN COUPLET OVERHEAD SIGNAL INDICATION U/G
Federal# / IRIS Program#: 0001684 / CFHWY00677
Region: Central Region
Location: Anchorage
Manager: Kevin L Jackson     Phone: (907)269-0610
Anticipate Advertising In: October 2021
Description of Work: Upgrade roadside hardware on A Street between Benson Boulevard and Northern Lights Boulevard. Work incudes removing and replacing the traffic signals at the intersection of Benson Boulevard and A Street and Northern Lights Boulevard and A Street and lighting system replacment adjacent to intersections.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

JNU DOUGLAS HIGHWAY SLOPE STABILIZATION
Federal# / IRIS Program#: 0959021 / SFHWY00163
Region: Southcoast Region
Location: Juneau
Manager: David A Pyeatt     Phone: (907)465-4490
Anticipate Advertising In: October 2021
Description of Work: Repair a recent slope failure adjacent to a soldier pile and lagging retaining wall along the Juneau-Douglas Highway, in Douglas, Alaska. The slope failure impacted adjacent property and exposed the solider pile and lagging wall supporting the Juneau-Douglas Highway and pedestrian pathway. The purpose of the project is to protect the highway slope from failure due to down slope landslide activity out of the ROW by constructing a soldier pile wall.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

JNU DOUGLAS HWY STAGE 2 CONSTRUCTION
Federal# / IRIS Program#: N/A / SFHWY00315
Region: Southcoast Region
Location: Juneau
Manager: David A Pyeatt     Phone: (907)465-4490
Anticipate Advertising In: October 2021
Description of Work: Stage 2 Construction
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

JNU MENDENHALL LOOP RD EGAN TO STEPHEN RICHARDS RESURFACE
Federal# / IRIS Program#: 0966028 / SFHWY00261
Region: Southcoast Region
Location: Juneau
Manager: Darryl Lester     Phone: (907)465-4421
Anticipate Advertising In: October 2021
Description of Work: Resurface JNU Mendenhall Loop Road from Egan Drive to Trinity Drive. Associated preventive maintenance activities include minor structural section improvements, replacement of a fish culvert, striping, signs, ADA improvements, and LED street lighting upgrade. The project length is 0.97 mile.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

Ketchikan Pioneer Home Structural Upgrades
Federal# / IRIS Program#: N/A / 2501000083
Region: Central Region
Location: Central Region
Manager: None     Phone: None
Anticipate Advertising In: October 2021
Description of Work: Seismic upgrades for roof and building structure
Engineer's Estimate Range: Between $500,000 and $1,000,000
Additional Info: Advertise contingent upon funds by User Agency

KTN - WATER ST TRESTLE #1 IMPRVMNT
Federal# / IRIS Program#: 0003224 / SFHWY00069
Region: Southcoast Region
Location: Ketchikan
Manager: Charles M Tripp     Phone: (907)465-4439
Anticipate Advertising In: October 2021
Description of Work: This project will replace or rehabilitate the Water Street Trestle No. 1 (No. 389).
Engineer's Estimate Range:
Additional Info:

KTN SAYLES/GORGE ST VIADUCT (#1841) IMPRVMT
Federal# / IRIS Program#: 0003225 / SFHWY00070
Region: Southcoast Region
Location: Ketchikan
Manager: Charles M Tripp     Phone: (907)465-4439
Anticipate Advertising In: October 2021
Description of Work: This project will replace or rehabilitate the Sayles/Gorge Street Viaduct (#1841).
Engineer's Estimate Range:
Additional Info:

MULDOON RD - DEBARR RD TO E 36TH AVE PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0544022 / CFHWY00406
Region: Central Region
Location: Anchorage
Manager: Sean M Baski     Phone: (907)269-0547
Anticipate Advertising In: October 2021
Description of Work: This is a preventative maintenance project for resurfacing Muldoon Road from Debarr Road to East 36th Avenue. This project includes resurfacing, roadside hardware, drainage improvements, intersection improvements, and ADA improvements as necessary.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

OLD SEWARD HIGHWAY, DIMOND BLVD TO DOWLING RD PP
Federal# / IRIS Program#: 0537009 / CFHWY00386
Region: Central Region
Location: Anchorage
Manager: Sean M Baski     Phone: (907)269-0547
Anticipate Advertising In: October 2021
Description of Work: This federally funded project will resurface Old Seward Highway from Dimond Blvd to Dowling Road. This project includes resurfacing, roadside hardware, drainage improvements, intersection improvements, and ADA improvements as necessary.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info: Preliminary Plans (~9 Mb)

POW HOLLIS HWY GUARDRAIL SAFETY IMPROVEMENTS HSIP
Federal# / IRIS Program#: 0003260 / SFHWY00306
Region: Southcoast Region
Location: Prince Of Wales Island
Manager: David B Epstein     Phone: (907)465-4483
Anticipate Advertising In: October 2021
Description of Work: Determine the extent of the zone where we can expect a driver to recover control of there vehicle and remove/replace downstream guardrail end anchors that fall in that zone with guardrail parallel end terminals that are compliant with the Manual for Assessing Safety Hardware 16 (MASH16).
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:

SGY STATE STREET PAVEMENT REHABILITATION
Federal# / IRIS Program#: 0972018 / Z680850000
Region: Southcoast Region
Location: Skagway
Manager: David A Pyeatt     Phone: (907)465-4490
Anticipate Advertising In: October 2021
Description of Work: Rehabilitate the pavement, replace curb and gutter in select areas, upgrade curb ramps and vehicular curb cuts to meet ADA standards, repair and/or replace drainage facilities as needed, and replace all signs within the project limits.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info: Rehabilitate the pavement from 1st Avenue to the Skagway River Bridge. Repair and/or replace existing drainage infrastructure. Replace existing sidewalk, curb ramps, and driveways to meet current ADA requirements.

SIT SAWMILL CREEK ROAD RESURFACING & PEDESTRIAN IMPROVEMENTS
Federal# / IRIS Program#: 0933042 / Z681000000
Region: Southcoast Region
Location: Sitka
Manager: Bran P Pollard     Phone: (907)465-4526
Anticipate Advertising In: October 2021
Description of Work: Improve Sawmill Creek Road to make it more accessible to pedestrians, including those with disabilities, and improve mobility of bikers. This project will widen the sidewalks on the south side of Sawmill Creek Road from the roundabout to Jeff Davis Street and install bump-outs around the existing utility poles at the North edge sidewalk for ADA compliance. Remove parking from the South side of the road and install 5' bike lanes on each side of the vehicle lanes. Install concrete median to better delineate Sawmill creek Road and DeGroff Street. Resurface the entire project length. Replace the underground storm drain system. Replace school zone flashers and highway lighting system. Install added signage at the cross walk at Baranoff Street.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info:

ANCHORAGE AREA DRAINAGE IMPROVEMENTS FY2019
Federal# / IRIS Program#: 0001651 / CFHWY00551
Region: Central Region
Location: Anchorage
Manager: Galen K Jones     Phone: (907)269-0550
Anticipate Advertising In: November 2021
Description of Work: Drainage infrastructure maintenance/repair and erosion mitigation to eliminate threats to the State's transportation system within the Anchorage area. Infrastructure including culverts, drainage basins, storm drain systems, ditches, swales, bridge embankments and abutments, side slopes, erosion protection features (such as dikes and rip rap), and other pertinent drainage and erosion protection infrastructure will be repaired, replaced, or improved as necessary. Roadways, pathways, sidewalks, and roadside appurtenances affected by drainage improvements are included.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

Burma Pit Road Little Tonsina Bridge Replacement
Federal# / IRIS Program#: N/A / NSHWY00479
Region: Northern Region
Location: Tonsina
Manager: David M Arvey     Phone: (907)451-2621
Anticipate Advertising In: November 2021
Description of Work: Replace the Little Tonsina River culverts with a new bridge on Burma Pit Road near MP 74.2 of the Richardson Highway.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:
Preliminary Plans PDF document

Coldfoot DPS Hangar Structural Repairs
Federal# / IRIS Program#: N/A / 25RC121623
Region: Central Region
Location: Central Region
Manager: Vadim Belozertsev     Phone: (907)269-0879
Anticipate Advertising In: November 2021
Description of Work: Complete structural upgrades of the hangar to correct deficiencies.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info:

Fairbanks Cushman Street Bridge
Federal# / IRIS Program#: 0663012 / Z622070000
Region: Northern Region
Location: Fairbanks
Manager: Russell M Johnson     Phone: (907)451-5059
Anticipate Advertising In: November 2021
Description of Work: Rehabilitate the Cushman Street Bridge #0390 and Cushman Street between the First Avenue and Terminal Street intersections. Project work will include bridge work, roadside hardware, ADA sidewalk and curb ramp improvements.
Engineer's Estimate Range:
Additional Info:

Homer: West Hill Road Sterling Highway to Skyline Drive
Federal# / IRIS Program#: 0001599 / CFHWY00300
Region: Central Region
Location: Homer
Manager: Matthew H Hansen     Phone: (907)269-0602
Anticipate Advertising In: November 2021
Description of Work: Resurface the West Hill Road from the Sterling Highway to Skyline Dr. Improvements may include signing, striping, drainage, pavement, dig-outs, curb ramps, guardrail, lighting, and utility relocation.
Engineer's Estimate Range: Between $2,500,000 and $5,000,000
Additional Info: Resurface West Hill Road in Homer, Alaska from the Sterling Highway to Skyline Dr.

HSIP: AIRPORT WAY / STEESE EXPRESSWAY RECONSTRUCTION
Federal# / IRIS Program#: 0002385 / NFHWY00245
Region: Northern Region
Location: Fairbanks
Manager: Carl F Heim     Phone: (907)451-5359
Anticipate Advertising In: November 2021
Description of Work: Reconstruct the intersection of Airport Way, Steese Expressway, Gaffney Road, and the Richardson Highway. Work includes roadside hardware, drainage improvements, intersection improvements, utilities, and ADA improvements including both curb ramps and sidewalks.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info: This project will advertise with the Steese Expressway Signal Interconnect (NFHWY00578) and Steese Expressway Chena River Bridge Redeck (NFHWY00421).

Northern Region Guardrail Upgrades - Glenn, Richardson, Tok Cutoff
Federal# / IRIS Program#: N/A / NFHWY00516
Region: Northern Region
Location: Northern Region
Manager: Ivet Hall     Phone: (907)451-5386
Anticipate Advertising In: November 2021
Description of Work: Reconstruct select guardrail on the Glenn Highway, Richardson and Tok Cutoff highways to meet current design standards. Work includes roadside hardware.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

QUARTZ CREEK BRIDGE REPLACEMENT
Federal# / IRIS Program#: 0001531 / Z585470000
Region: Central Region
Location: Cooper Landing
Manager: Christina A Huber     Phone: (907)269-0572
Anticipate Advertising In: November 2021
Description of Work: Replace bridge #1020 across Quartz Creek on Quartz Creek Road
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info: Replace bridge #1020 across Quartz Creek on Quartz Creek Road.

SEWARD HWY: MP 0 TO 8 PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0311034 / CFHWY00109
Region: Central Region
Location: Seward
Manager: Christopher L Bentz     Phone: (907)269-0652
Anticipate Advertising In: November 2021
Description of Work: Resurface the Seward Highway from Milepoint 0-8. The project will also include, as necessary, improvements to pedestrian curb ramps, guardrail, guardrail end treatments, dig-outs, drainage repair, sign replacement, replacement striping, and utility adjustments as needed.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info: Resurface the Seward Highway from MP 0-8. Project also includes markings, signage, pedestrian curb ramps, guardrail, guardrail end sections, brush clearing, drainage improvements, and utility adjustments.

Steese Expressway Chena River Bridge #0231 Redeck
Federal# / IRIS Program#: 0651033 / NFHWY00421
Region: Northern Region
Location: Fairbanks
Manager: Russell M Johnson     Phone: (907)451-5059
Anticipate Advertising In: November 2021
Description of Work: Replace the deck of the Chena River Bridge #0231 and resurface the Steese Expressway. In addition to bridge work, there will be pavement preservation, roadside hardware, ADA and drainage improvements.
Engineer's Estimate Range:
Additional Info: Replace the deck of the Chena River Bridge #0231 and resurface the Steese Expressway. In addition to bridge work there will be pavement preservation, roadside hardware, ADA and drainage improvements.

STEESE EXPRESSWAY SIGNAL INTERCONNECT- AIRPORT WAY TO 3RD ST
Federal# / IRIS Program#: N/A / NFHWY00578
Region: Northern Region
Location: Fairbanks
Manager: Carl F Heim     Phone: (907)451-5359
Anticipate Advertising In: November 2021
Description of Work: Install a fiber optic signal interconnect system to connect the signals along the Steese Expressway from Airport Way to 3rd Street. Project includes roadside hardware.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info: This project will advertise with the Airport Way/Steese Expressway Reconstruction project. NFHWY00245 and Steese Expressway Chena River Bridge Redeck (NFHWY00421).

AMATS: HILAND RD MP 0 TO MP 3.2 PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0001663 / CFHWY00568
Region: Central Region
Location: Eagle River
Manager: Galen K Jones     Phone: (907)269-0550
Anticipate Advertising In: December 2021
Description of Work: Resurface Hiland Road, including milling, paving, minor subgrade rehabilitation, drainage improvements, updating guardrail and sign posts to meet current safety standards, replacing striping and select signage, curb and gutter, lighting, and roadside signal and or traffic data hardware.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

HNS HWY RECONSTRUCTION MILEPOST 3.9-25.0
Federal# / IRIS Program#: 0956028 / Z686060000
Region: Southcoast Region
Location: Haines
Manager: Gregory K Lockwood     Phone: (907)465-2393
Anticipate Advertising In: December 2021
Description of Work: Realign and widen, including replacement of the Chilkat River Bridge #0742. Straighten curves to meet 55 mph design speed. Provide a long-term solution to debris flow problems near MP 19 and 23. Enhancements are planned along the Chilkat River and at the Mt. Ripinsky trailhead.
Engineer's Estimate Range: Between $30,000,000 and $40,000,000
Additional Info: Reconstruct the Haines Highway from milepost 20.0 to 25.0 including the Chilkat River Bridge is the next and final phase to advertise
Preliminary Plans PDF document
Cross Sections PDF document
Reports PDF document

Kenai Spur Rehab Phase II - Advance Utility Relocation
Federal# / IRIS Program#: TBD / CFHWY00703
Region: Central Region
Location: Kenai Peninsula
Manager: Christina A Huber     Phone: (907)269-0572
Anticipate Advertising In: December 2021
Description of Work: Relocate utilities in advance of construction.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

KONGIGANAK AIRPORT RESURFACING
Federal# / IRIS Program#: 3-02-0380-004-2021 / CFAPT00433
Region: Central Region
Location: Kongiganak
Manager: Jenelle R Brinkman     Phone: (907)269-0606
Anticipate Advertising In: December 2021
Description of Work: Resurface the runway, taxiway, safety areas, and apron to correct ponding issue and differential settlement. Widen and extend Runway Safety Area to accommodate Aircraft Design Group II aircraft. Shift runway thresholds to accommodate required Runway Safety Area beyond threshold end. Replace airport lighting and threshold markers and cones. Expand the apron to accommodate aircraft tiedowns, parking, and a new single bay SREB. Relocate existing SREB and associated appurtenances. Advertising schedule is contingent on FFY 2021 funding. Expected FFY 2022 funding.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info:

KTN AIRPORT FERRY CAPACITY MODIFICATIONS (GRAVINA)
Federal# / IRIS Program#: 0003233 / SFHWY00184
Region: Southcoast Region
Location: Ketchikan
Manager: Kirk D Miller     Phone: (907)465-1215
Anticipate Advertising In: December 2021
Description of Work: Modify existing airport ferry vessel to expand passenger and vehicle space.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info: Modify Airport Ferry Shuttle to accommodate more passengers. Project construction may not be funded.

MITCHELL EXPRESSWAY SIGNAL INTERCONNECT
Federal# / IRIS Program#: N/A / NFHWY00577
Region: Northern Region
Location: Fairbanks
Manager: Carl F Heim     Phone: (907)451-5359
Anticipate Advertising In: December 2021
Description of Work: Install a fiber optic signal interconnect system to connect the signals along the Mitchell Expressway from University Avenue to South Cushman Street. Project includes roadside hardware.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

NOR REG VARIOUS AIRPORTS VISUAL AID REPLACEMENT FFY2020
Federal# / IRIS Program#: N/A / NFAPT00537
Region: Northern Region
Location: Regionwide
Manager: Daniel A Phillips     Phone: (907)451-2926
Anticipate Advertising In: December 2021
Description of Work: Replace visual aids at the following airports: Beaver, Birch Creek, Elim, and Koyuk.
Engineer's Estimate Range:
Additional Info:

Selawik Barge Landing Access Road and Boardwalk Improvements
Federal# / IRIS Program#: 0002280 / Z637720000
Region: Northern Region
Location: Selawik
Manager: Christopher F Johnston     Phone: (907)451-2322
Anticipate Advertising In: December 2021
Description of Work: Rehabilitate the existing barge landing access road, construct a new gravel barge staging pad, and associated access points, install lighting, and replace sections of existing boardwalk.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

SEWARD AIRPORT IMPROVEMENTS
Federal# / IRIS Program#: N/A / Z548570000
Region: Central Region
Location: Seward
Manager: Joy A Vaughn     Phone: (907)269-0812
Anticipate Advertising In: December 2021
Description of Work: Shift, raise and reconstruct R/W 16/34. Construct Armor protection. Rehabilitate aprons, replace airport lighting, and construct pads for NAVAIDS. Close R/W 13/31, Taxiways A, D, and E. Miscellaneous fencing, signing, etc...
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info:

STERLING HWY: MP 157-169 RECON-ANCHOR PT TO BAYCREST HILL
Federal# / IRIS Program#: 0211052 / Z581060000
Region: Central Region
Location: Kenai Peninsula
Manager: Kelly L Summers     Phone: (907)269-0546
Anticipate Advertising In: December 2021
Description of Work: Reconstruction and upgrading of 12 miles of Sterling Highway along existing corridor. Project upgrades include widening, construction of passing lanes, resurfacing, scenic turnouts, drainage improvements, minor realignment, and configuration to current AASHTO geometric standards. Also, rehabilitation/replacement of the North Fork Anchor River and Anchor River Bridges.
Engineer's Estimate Range: Between $80,000,000 and $90,000,000
Additional Info: Reconstruct and upgrade 12 miles of the Sterling Hwy along the existing corridor from Anchor Pt to Baycrest Hill. Replacement of North Fork Anchor River and Anchor River Bridges. Project upgrades include widening, construction of passing lanes, resurfacing, drainage improvements, minor realignment, and configuration to current AASHTO geometric standards.

AMATS ANCHORAGE AREA PATHWAY &TRAILS PAVEMENT REPLACEMENT
Federal# / IRIS Program#: 0001666 / CFHWY00619
Region: Central Region
Location: Anchorage
Manager: Steven J Rzepka     Phone: (907)269-0592
Anticipate Advertising In: January 2022
Description of Work: This AMATS project will repair and replace pavement on sections of pathway in the Municipality of Anchorage, which may include those listed in Table 7 of the AMATS TIP or other priorities. The pavement preservation project may include roadside hardware, improvements to drainage and ADA, and utilities as necessary.
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Additional Info:

ANC TAXILANES E1, E3, AND E/G INTERSECTION RECONSTRUCTION
Federal# / IRIS Program#: N/A / CFAPT00675
Region: Central Region
Location: Anchorage
Manager: Matthew H Hansen     Phone: (907)269-0602
Anticipate Advertising In: January 2022
Description of Work: Reconstruct Taxilanes E1, E3 and E/G Intersections. Project includes, new structual section, Lighting, markings and signs; remove, replace or modify existing storm drainage; and adjust utilities as necessary.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info:

ANC TAXIWAY R SOUTH SURFACE SEAL
Federal# / IRIS Program#: N/A / CFAPT00758
Region: Central Region
Location: Anchorage
Manager: Jennifer M Carle     Phone: (907)266-2731
Anticipate Advertising In: January 2022
Description of Work: Apply a seal coat to the taxiway (TW) surfaces and restripe.
Engineer's Estimate Range: Between $200,000 and $500,000
Additional Info: Surface seal taxiway

COHOE LOOP RD MP 0-9 PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0001645 / CFHWY00490
Region: Central Region
Location: Kasilof
Manager: Clint J Adler     Phone: (907)269-0544
Anticipate Advertising In: January 2022
Description of Work: Pavement preservation, roadside hardware, drainage improvements, intersection improvements, ADA improvements and utilities.
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info: Resurface Cohoe Loop Road from MP 0 to 9. Includes roadside hardware and drainage improvements.

DALTON HWY MP 18-37 RECONSTRUCTION
Federal# / IRIS Program#: 0652017 / Z607350000
Region: Northern Region
Location: Northern Region
Manager: Carl F Heim     Phone: (907)451-5359
Anticipate Advertising In: January 2022
Description of Work: CLARIFY PROJECT SCOPE: Reconstruct the Dalton Highway from Milepost 18 to 37. The project work includes bridge work, roadside hardware and drainage improvements.
Engineer's Estimate Range: Between $40,000,000 and $50,000,000
Additional Info:

FUNNY RIVER RD PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0485002 / CFHWY00493
Region: Central Region
Location: Kenai
Manager: Clint J Adler     Phone: (907)269-0544
Anticipate Advertising In: January 2022
Description of Work: Pavement preservation, bridge work, roadside hardware, drainage improvements, intersection improvements, ADA improvements and utilities.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info: Pavement preservation, bridge work, roadside hardware, drainage improvements, intersection improvements, ADA improvements and utilities.

UNALASKA TAXIWAY AND APRON REHABILITATION
Federal# / IRIS Program#: N/A / SFAPT00178
Region: Southcoast Region
Location: Unalaska
Manager: Gregory K Lockwood     Phone: (907)465-2393
Anticipate Advertising In: January 2022
Description of Work: Begin preliminary design for the Unalaska airport apron and taxiway rehabilitation. For the terminal apron: mill 2 inches of the existing AC pavement and repair underlying PCC. Repave with 2 inches hot mix asphalt. For the hanger apron: repair PCC surface and joints and overlay with 2 inches of hot mix asphalt.
Engineer's Estimate Range:
Additional Info: Rehabilitate the airport apron and taxiway apron.

Airport Way (West) Improvements
Federal# / IRIS Program#: 0610004 / Z618720000
Region: Northern Region
Location: Fairbanks
Manager: David K Fischer     Phone: (907)451-5357
Anticipate Advertising In: February 2022
Description of Work: Reconstruct Airport Way, Hoselton Road, Dale Road, Old Airport Way and Wien Lake Road. Work includes roadside hardware, drainage improvements, intersection improvements, utilities and ADA improvements such as curb ramps and sidewalks.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info:
Preliminary Plans PDF document

AIRPORT WAY WEST BICYCLE/PEDESTRIAN FACILITY
Federal# / IRIS Program#: 0002449 / NFHWY00447
Region: Northern Region
Location: Fairbanks
Manager: David K Fischer     Phone: (907)451-5357
Anticipate Advertising In: February 2022
Description of Work: Construct a bicycle/pedestrian connection on Airport Way West from the Fairbanks International Airport terminal to Dale Road. Work will include drainage and intersection improvements, and roadside hardware.
Engineer's Estimate Range:
Additional Info:

ALASKA HWY MP 1235-1268 REHABILITATION
Federal# / IRIS Program#: 0A11014 / Z607520000
Region: Northern Region
Location: Northway
Manager: David K Fischer     Phone: (907)451-5357
Anticipate Advertising In: February 2022
Description of Work: CLARIFY SCOPE: Rehabilitate the Alaska Highway and construct new passing lanes. Project work will include bridge work, roadside hardware, drainage, intersection improvements and utilities.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info:

KENAI SPUR RD REHAB: SPORTS LAKE RD TO SWIRES RD PH 2
Federal# / IRIS Program#: 0221019 / CFHWY00253
Region: Central Region
Location: Kenai
Manager: Christina A Huber     Phone: (907)269-0572
Anticipate Advertising In: February 2022
Description of Work: This project will rehabilitate the Kenai Spur Highway between Soldotna and Kenai. A 5-lane highway will be constructed between the Sports Lake Road and Robin Drive intersections to increase capacity and improve safety. This is the second of two phases to construct the project.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info:

Point Hope Airport Realignment
Federal# / IRIS Program#: 3-02-0226-XXX-2018 / Z638420000
Region: Northern Region
Location: Point Hope
Manager: Jonathan J Hutchinson     Phone: (907)451-5479
Anticipate Advertising In: February 2022
Description of Work: Realign the runway at the Point Hope Airport.
Engineer's Estimate Range: Between $10,000,000 and $20,000,000
Additional Info: CY21 and CY22

HOLLYWOOD RD : VINE RD TO BIG LAKE RD PAVEMENT PRESERVATION
Federal# / IRIS Program#: 0001686 / CFHWY00392
Region: Central Region
Location: Big Lake
Manager: Christina A Huber     Phone: (907)269-0572
Anticipate Advertising In: March 2022
Description of Work: Resurface Hollywood Road from Vine Road to Big Lake Road, a distance of approximately 8.1 miles. The project will also include, as necessary: striping, minor ditch and culvert work, and sign and guardrail replacement if damaged or missing." If I created the name correctly it should be: Hollywood Road: Vine Road to Big Lake Road, Pavement Preservation .
Engineer's Estimate Range: Between $5,000,000 and $10,000,000
Additional Info:

HOMER AIRPORT IMPROVEMENTS
Federal# / IRIS Program#: N/A / CFAPT00491
Region: Central Region
Location: Homer
Manager: Matthew H Hansen     Phone: (907)269-0602
Anticipate Advertising In: March 2022
Description of Work: The project proposes to rehabilitate the runway and runway safety area; remove obstructions; rehabilitate Taxiway B; resurface Taxiway A; resurface the General Aviation Apron; replace airfield lighting, remove Taxiway D; construct new perimeter access road; and install an access control system.
Engineer's Estimate Range: Between $20,000,000 and $30,000,000
Additional Info:

KTN SAXMAN TO SURF ST PAVEMENT REHABILITATION - SOUTH TONGAS
Federal# / IRIS Program#: 0902031 / Z675710000
Region: Southcoast Region
Location: Ketchikan
Manager: David A Pyeatt     Phone: (907)465-4490
Anticipate Advertising In: March 2022
Description of Work: Updated 7/14/10: Widening, guardrail and drainage improvements and roadway reconstruction and repaving. Rev. 8/10 Construct recreational path on water side of roadway. Improve vertical and horizontal alignment. Provide additional parking if required to mitigate for loss due to addition of separated pathway. Provide geotech and coastal engineering to minimize impacts to ROW and environmentally sensitive areas. Additional public involvement as required to present ROW challenges posed by the separated pathway. Coordinate utilities with Ketchikan and Saxman communities.
Engineer's Estimate Range:
Additional Info: Rehabilitate the roadway and appurtenances from the north end of the City of Saxman to Surf Street. Widen the roadway and construct a new shared use pathway on the water side where none exists.

KTN SOUTH TONGASS HWY DEERMOUNT TO SAXMAN WIDENING
Federal# / IRIS Program#: 0902039 / Z676850000
Region: Southcoast Region
Location: Ketchikan
Manager: David A Pyeatt     Phone: (907)465-4490
Anticipate Advertising In: March 2022
Description of Work: Reconstruct roadway and non-motorized facilities, as necessary, to improve safe movement of vehicle, bicycle and pedestrian traffic.
Engineer's Estimate Range:
Additional Info: Rehabilitate the roadway and appurtenances from Deermount Street to the north end of the City of Saxman. Reconstruct the sidewalks and shared use pathway. Construct a new shared use pathway where none exists. Construct a new sidewalk on the uphill side of the road from the existing terminus near Deermount Street to the lower USCG base entrance.

PARKS HWY MP 99 - 163 DRAINAGE & CULVERT IMPROVEMENTS
Federal# / IRIS Program#: 0A41042 / CFHWY00592
Region: Central Region
Location: Matanuska-Susitna Borough
Manager: Tom J Schmid     Phone: (907)269-0543
Anticipate Advertising In: March 2022
Description of Work: Project will construct improvements to drainage including culvert repair, replacement, and new installations, as necessary to provide adequate drainage.
Engineer's Estimate Range:
Additional Info: